Specialists in the conservation and repair of traditional and listed buildings
Owning an historic building brings with it a responsibility, a responsibility to care for and maintain a building of importance so it can be passed onto future generations.
Maintaining and repairing historic buildings requires a sympathetic approach to its care and an understanding of how buildings were constructed, how they may have been adapted and how they decay.
Compared to traditional structures modern buildings are built using different techniques, different materials and built to different standards.
Old buildings and structures need to “breathe”. 20th century products such as cement, gypsum and damp proofing materials can have a negative long-lasting effect on the breathability of structures that can, in time, lead to damp penetration and associated problems. Therefore, it is crucial that “like for like” materials and methods are employed when considering conserving and repairing historic fabric.
It is generally better to do nothing than do the wrong thing!
When considering any work to an historic building its extremely important to evaluate the long term needs of the building rather than any short-term gain from using inappropriate repairs.
David Sleight Conservation has recently carried out the following surveys and reports to historic buildings.
For Historic England and South Kesteven District Council a Condition Survey was carried out to the historic fabric of the Angel and Royal Hotel in Grantham. The national significance of the building is demonstrated by its Grade I listed status, however the 14C stonework façade is deteriorating and as a result the building is now on Historic England’s Buildings at Risk register.
For Avenue Architectural Design Ltd a condition report on the structural cob and plasterwork of the outbuildings at the Old Vicarage was compiled to assist with the application of Listed Building Consent. The objective of the report was to comment on the condition of the cob, rendering and internal plastering used in the construction of the outbuildings and highlight areas of concern relating to proposed building work. The report identified existing defects and suggested options for repairs where necessary.
For Leaf Architecture a Schedule of Works was compiled to assist with the application of Listed Building Consent. This also included making proposals for replacement materials and giving guidance on methods of repair for the following…brick repairs and repointing, the reinstatement of reed and lath and plaster ceilings, lime plasters for internal walls, as well as repairs to mortar floors, sometimes termed lime ash floors.
For a private client a Heritage Statement was compiled the aim of which was to describe the architectural and historic significance of the property for a forthcoming planning application.
A survey was carried out of the external stonework of this Grade I historic house to ascertain its condition, structural stability and provide a maintenance programme for future repairs.
For the architects BB Partnership a report on the condition of the brickwork of this Grade II* was carried out to analysis defects, provide a mortar analysis and to recommendation “best practice “ for repairs.
The PCC were concerned about the friability of the sandstone on the west elevation of the church tower. So the elevation was defrassed and inspected via a platform access and a report on the stone’s condition provided to the church.
The lath an plaster ceilings on the first and second floors were inspected from within the roof space to ensure the plaster and the laths were in a sound and stable condition.
At the request of the owners a survey was carried out of the external masonry to identify necessary repairs and provide a schedule for carrying repairs.